Installation

What Happens on Installation Day

The day we fit your air conditioning, step by step: what to get ready, what we do from the moment we arrive to the moment you sign it off, how long it takes, how much mess it makes, and what you are left with.

6 min read•Video: under two minutes•Updated October 2026
Paper-collage house in cross-section on a summer day, with a living room downstairs where air conditioning is about to be fitted, and an installer’s van in the garden.
Read the transcript.

The short answer

  • A wall-mounted split system in one room is usually fitted in one day. Several rooms on one outdoor unit take one to three days.
  • It takes one small hole through the outside wall, a few fixings and a line of trunking where the pipes cannot be hidden. Dust sheets go down first, and everything is hoovered before we leave.
  • Before any refrigerant is released, the pipework is pressure-tested with nitrogen and put under a vacuum, and both are recorded.
  • We test it in cooling and heating, show you how to use it, and you sign it off. Your handover pack follows by email.

Before we arrive

Your booking email gives the date, the time we arrive and how many days we will be on site. A few things sorted beforehand help the day go smoothly:

  • Clear the space where each indoor unit is going, and move furniture away from that wall.
  • Make sure we can get to the outside wall where the outdoor unit will sit.
  • If you can, keep a parking space free near the house for our van.
  • Someone over 18 needs to be home when we arrive, and on each day we are on site.
  • Keep pets away from the rooms we are working in.
  • Know where your fuse box (consumer unit) is – we will need to get to it.

If the date or time no longer suits, reply to your booking email, call us on 0161 987 7786 or message us on WhatsApp on 07766 395693, and we will find another.

The day, step by step

This is a wall-mounted split system, the most common job: one indoor unit, one outdoor unit and the pipes between them. A multi-split repeats the indoor steps in each room, and every circuit is tested on its own.

  1. 1. We arrive and agree the plan

    We walk through the plan with you first: where the indoor unit goes, where the outdoor unit sits and the route the pipes take between them, as agreed at your survey. Then the dust sheets go down and any furniture near the wall is moved clear.

  2. 2. The indoor unit’s mounting plate goes up

    A steel plate is fixed level, high on the wall. The indoor unit hangs on it later, once the pipes are through.

  3. 3. One hole through the outside wall

    We core-drill one hole about 65 mm across (80 mm for larger units), sloping slightly down to the outside so water cannot run back in. This is the noisiest part of the day: usually 30 to 45 minutes, and up to an hour depending on how the house is built. The dust is caught at the hole.

  4. 4. The outdoor unit goes in

    It goes on wall brackets or on feet on the ground, with the clear space around it that the manufacturer asks for, so it can breathe.

  5. 5. Pipes, drain and cable

    Two insulated copper pipes, a condensate drain and a control cable run from the indoor unit, through the hole, to the outdoor unit. They are hidden where the route allows and in neat trunking where it does not, and the hole is sealed around them on both sides.

  6. 6. Its own electrical circuit

    The system gets a dedicated circuit from your consumer unit, which is why we need to get to your fuse box, and its own isolator switch. That is notifiable work under Part P of the Building Regulations, so it is done and certified by a registered electrician.

  7. 7. A pressure test with nitrogen

    Before any refrigerant goes near the pipework, we fill it with dry nitrogen at pressure and leave it to stand. If the pressure holds, every joint is tight. We write down the test pressure and how long it held.

  8. 8. A vacuum

    A vacuum pump then draws the air and moisture out of the pipes, and we leave the vacuum standing to prove it does not creep back. The reading and the hold time go on the record too.

  9. 9. The refrigerant is released

    The outdoor unit arrives already charged with refrigerant, enough for a set length of pipe. Opening its valves lets it into the pipes. A longer pipe run needs a little more added, and the amount is weighed in and recorded, as the F-gas rules require.

  10. 10. A test run in cooling and heating

    We run the system in both modes and measure the air going in and coming out, check the condensate drains away, and test the controller.

  11. 11. We tidy up

    Everything is hoovered, and the packaging and waste go away with us.

  12. 12. We show you how it works, and you sign it off

    We show you the remote, how to take out and clean the filters and how often, and where the isolator is, and explain the annual service and the warranty. Then you sign the job off on our phone or tablet.

What you are left with

When the job is signed off, your Installation Handover Pack comes to you by email. Keep it with your paperwork. It holds:

  • The completion sign-off you signed.
  • The commissioning record for each system: what was fitted, the serial numbers, the test readings and the F-gas details.
  • Your warranty statement.
  • The aftercare sheet: looking after the system, and what to do if something is not right.

The same email links to the manufacturer’s manuals for your equipment, where we have them. The links do not expire.

About a week later we check in to make sure everything is working and you are happy with it. An annual service keeps the system at its best and, where a manufacturer’s warranty applies, keeps it valid. We get in touch when your first one is due.

How long it takes

Typical fitting time for each type of air conditioning we fit
System Typical fitting time
Wall-mounted split systemsUsually one day
Multi-split systemsOne to three days, depending on the rooms and pipe routes
Ceiling cassettesOne to two days per unit in a tiled ceiling; longer in plasterboard
Ducted air conditioningSeveral days, best planned into building work

For a typical home with straightforward access. Your booking email says how many days we will be on site for your job.

What makes a day longer is mostly the pipe route: a long run, an upstairs room, a route through the loft or under the floor, or an outdoor unit that has to go up high. The survey finds these, and your quote allows for them. For how each type is fitted, see the types of air conditioning.

How we keep the mess down

  • Dust sheets over floors and furniture, and furniture moved clear of the work.
  • Core drilling with dust extraction, or wet coring, so the dust is caught at the hole.
  • The hole sloped to the outside and sealed around the pipes, so no draughts or water get in.
  • Pipes hidden in walls, lofts or floor voids where the route allows, and in neat trunking where it does not.
  • Everything hoovered and the packaging taken away at the end of the day.

The drilling is the noisy part: usually 30 to 45 minutes, and up to an hour depending on how the house is built. The rest of the day is fixing, connecting and testing, which is quieter work.

Video transcript

Here’s what happens on the day we fit your air conditioning. Before we arrive, just clear the wall where the indoor unit is going.

We walk through the plan with you, then the dust sheets go down.

The indoor unit’s mounting plate goes up, high on the wall. Then we drill one small hole through the wall. That’s the noisy part, and the dust is caught at the hole.

The outdoor unit goes on brackets, or on feet on the ground. Two copper pipes, a drain and a cable join the two units, in neat trunking where they can’t be hidden. And the system gets its own circuit from your fuse box.

Before any refrigerant goes in, we fill the pipes with nitrogen, and check the pressure holds. Then a vacuum pump draws out the air and moisture. Only then do we release the refrigerant.

We test it in cooling and in heating, and check the water drains away.

We hoover up, and take the packaging away. Then we show you how to use it, and you sign it off. Your handover pack follows by email.

One room is usually done in a day. Several rooms on one outdoor unit take one to three days.

Arctic Air Conditioning. Cool in summer, warm in winter.

Frequently asked questions

How long does an air conditioning installation take?

A wall-mounted split system in one room is usually fitted in one day. A multi-split, with several rooms on one outdoor unit, takes one to three days depending on the rooms and the pipe routes. Ceiling cassettes and ducted systems take longer. Your booking email says how many days we will be on site.

Do I need to be at home?

Someone over 18 needs to be home when we arrive, and on each day we are on site. At the end of the day we show you how to use the system, so it helps if the person who will use it most is there for that.

How much mess does fitting air conditioning make?

For a wall-mounted split, very little: one small hole, a few fixings and a line of trunking where the pipes cannot be hidden. Dust sheets go down first, the dust from the hole is caught as it is drilled, and everything is hoovered before we leave.

Will my electricity be turned off?

Only while the new circuit is connected at your consumer unit, which is a short part of the day.

What do I get when the job is finished?

An Installation Handover Pack by email: the completion sign-off you signed, the commissioning record for each system with its serial numbers and F-gas details, your warranty statement and the aftercare sheet, with links to your equipment’s manuals where we have them.

What happens after the installation?

About a week later we check in to make sure everything is working and you are happy with it. Your first annual service is due about a year after the installation, and we get in touch nearer the time to arrange it.

Thinking about air conditioning?

Two minutes with our estimator gets you a realistic range for your rooms. A free survey turns it into a fixed quote, with no obligation and no hard sell.

Related Articles